Heat Treatment
  1. Regular monitoring and complete display of progress of each lot.
  2. Microstructural Analysis and Digital Printout.
  3. Surface/Core Hardness Testing
  4. Surface Decarb Testing
  5. Retention of sample from each lot for fixed duration for complete traceability.
  6. Batch System for complete traceability.
 
General
  1. 100% Crack Detection by Magnetic Crack Detection Machine
  2. 100% Cold Coining and Gauging, Flatness, Parallelism, Layout at Final inspection stage.
  3. 100% Final Inspection before despatch
  4. Pre-Dispatch inspection by customer representative
  5. Despatch Certificate with each Lot which carries complete inf on that lot for complete traceability.
  6. Electronic Meters installed at Packing Stage for 100% error proof packing.