Steel Receipt
  1. Ultrasonic Testing of each length
  2. Chemical Composition
  3. Step Down Testing
  4. Hardware Testing
  5. Inclusive Rating
  6. Grain Flow Testing
  7. Upset Testing
   

Steel Storage/Shearing

  1. Steel is kept caged and under lock and key before/after shearing.
  2. Bandsaw Cutter to ensure straight edge cutting and exact weight.
  3. Colour coding.
   

Forging

  1. All furnaces are with Automatics Temperature Controllers
  2. Dimensional Inspection
  3. 100% Vishual Inspection
  4. Magnaflux as per sampling plan
  5. Layout inspection at regular intervals
  6. Complete Layout of 1st Pc
  7. Die Life monitoring
  8. Identification for each pc for Heat Code, Die Code, Shift Code, Customer Code.